Template Compliance Schedule

Template Compliance Schedule

This Compliance Schedule should be viewed in conjunction with the following:
Compliance schedule number
<enter number>
Anniversary date
<enter date>
<insert picture>                                                                                      <insert picture>
The owner
Name of owner
Contact person
Mailing address
Street address/registered office
Phone number
Mobile
E-mail address
Website
Street address of building
Legal description of land
Building name
Location of building within site/block number
<insert picture>
 
 
 
 
 
 
 Description:
Levels or unit numbers
Year of first construction
Intended life of the building
Highest fire hazard category
Risk group(s)
Compliance schedule is kept at:
Building use & occupancy (current lawfully established use)
Level
Classified use from NZBC A1 (plus description)
Use
 (NZBRegs 2005 Schedule 2)
Occupancy load
XXXXXX <Total>
Specified systems contained in this compliance schedule
SS 1
Automatic systems for fire suppression
SS 2
Automatic or manual emergency warning systems for fire or other dangers
SS 3 Electromagnetic or automatic doors or windows
SS 3/1
Automatic doors
SS 4
Emergency lighting systems
SS 7
Automatic back-flow preventers connected to a potable water supply
SS 8 Lifts, escalators, travelators or other systems for moving people or goods within buildings
SS 8/1
Passenger-carrying lifts
SS 9
Mechanical ventilation or air conditioning systems
SS 12 Audio loops or other assistive listening systems
SS 12/2
FM radio frequency systems & infra-red beam transmission systems
SS 13 Smoke control systems
SS 13/1
Mechanical smoke control
SS 14 Emergency power systems for, or signs relating to, a system or feature specified for any of the above systems or features
SS 14/2
Signs relating to a system or feature specified in any of clauses 1 to 13
SS 15 Any or all of the following features, so long as: they form part of a building’s means of escape from fire; those means also contain any or all of the systems or features specified in clauses 1-6, 9 and 13
SS 15/2
Final exits (as defined by clause A2 of the Building Code)
SS 15/3
Fire separations (as so defined)
SS 15/4
Signs for communicating information intended to facilitate evacuation
Version Control
Version #
Notes or changes
Date
Version 0
Original building consent (number # refers)
Version 1
Version 2
SS 1 Automatic systems for fire suppression                     
Description (incl type)
Specified system photo/s
Make (if known)
Installation Date
Model (if known)
Location/s
Performance standard
Inspection procedures

Inspection frequencies
Weekly
Monthly
Quarterly
Annually
Inspection personnel
IQP
IQP
IQP
IQP
Maintenance procedures
System interfacing

Reporting procedures
Signage
Comments/notes
SS 2 Automatic or manual emergency warning systems for fire or other dangers
Description (incl type)
Specified system photo/s

Make (if known)
[brand name & series number]
Installation date
Model (if known)
[model number]
Location/s
Performance standard
Inspection procedures
Inspection frequencies
Monthly
Annually
Inspection personnel
IQP
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 3/1 Automatic doors
Description (incl type)

Specified system photo/s

 
Make (if known)
[manufacturer]
Installation date
Models (if known)
[model number]
Location/s
Performance standard
Inspection procedures
Inspection frequencies
Daily
(when in use)
Monthly
Annually
Inspection personnel
Owner or Agent
Owner or Agent
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 4 Emergency lighting systems
Description (incl type)
Specified system photo/s

 
 
Make (if known)
[brand name]
Installation date
[brand name]
[brand name]
Models (if known)
[model name]
[model name]
[model name]
Location
Refer to attached plans
Performance standard
Inspection procedures
Inspection frequencies
Six Monthly
Annually
Inspection personnel
IQP
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 7 Automatic back-flow preventers connected to a potable water supply
Description (incl type)
Specified system photo/s

 
Make (if known)
[manufacturer name]
Installation date
Models (if known)
[model name]
Location
Performance standard
Inspection procedures
Inspection frequencies
Annually
Inspection personnel
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 8/1 Passenger-carrying lifts
Description (incl type)
Specified system photo/s
 
 
Make (if known)
[manufacturer name]
Installation date
Models (if known)
[model name]
Location
Performance standard
Inspection procedures
Inspection frequencies
Annually
Inspection personnel
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 9 Mechanical ventilation or air conditioning systems
Description (incl type)
Specified system photo/s

 
Make (if known)
[manufacturer name]
Installation date
[manufacturer name]
[manufacturer name]
Model (if known)
Location
Performance standard
Inspection procedures
Inspection frequencies
Monthly
Quarterly
Annually
Inspection personnel
IQP
IQP
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 12/2 FM radio frequency systems & infra-red beam transmission systems
Description (incl type)
Specified system photo/s

 
Make (if known)
Installation date
Models (if known)
[model name]
Location
Performance standard
Inspection procedures
Inspection frequencies
Six Monthly
Annually
Inspection personnel
IQP
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 13/1 Mechanical smoke control
Description (incl type)
Specified system photo/s

 
Make (if known)
[manufacturer name]
Installation date
Model (if known)
[brand name]
Location
Performance standard
Inspection procedures
Inspection frequencies
Six Monthly
Annually
Inspection personnel
IQP
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 14/2 Signs relating to a system or feature specified in any of clauses 1 to 13
Description (incl type)
Specified system photo/s
Make (if known)
[manufacturer name]
Installation date
Model (if known)
Related specified systems
Location
Performance standard
Inspection procedures
Inspection frequencies
Annually
Inspection personnel
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 15/2 Final exits
Description (incl type)
Specified system photo/s

 
Make (if known)
[manufacturer name]
Installation date
2020
Models (if known)
[brand name]
Location
Performance standard
Inspection procedures
Inspection frequencies
Daily (when in use)
Monthly
Annually
Inspection personnel
Owner or Agent
Owner or Agent
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 15/3 Fire separations
Description (incl type)
Specified system photo/s

 
Make (if known)

Installation date
Models (if known)
Location
Performance standard
Inspection procedures
Inspection frequencies
Daily (when in use)
Monthly
Six Monthly
Annually
Inspection personnel
Owner or Agent
Owner or Agent
IQP
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
SS 15/4 Signs for communicating information intended to facilitate evacuation
Description (incl type)
Specified system photo

Make (if known)
[manufacturer name]
Installation date
Model (if known)
Location
Performance standard
Inspection procedures
Inspection frequencies
Monthly
Annually
Inspection personnel
Owner or Agent
IQP
Maintenance procedures
System interfacing
Reporting procedures
Signage
Comments/notes
Signed on behalf of the Council
Name
Position
Date
Signature
Address
Appendices/Attachments
Appendix
Documents (including drawings)
Page number
Appendix A

Appendix B


Appendix C

Appendix D

Appendix E

Appendix F

Appendix A: Location & site plan of Bulls Community Centre
Appendix B: Floor plans showing locations of exit signs & manual call points
Appendix C: Cross-sections showing fire cells within the building
Appendix D: Extract from fire engineering strategy report
Appendix E: Producer statement
Appendix F: Evacuation floor maps